Call Us/Whatsapp Us: +65 8385 9933 | Email: aman@amanengineering.com.sg for inquiry and free quotation

Slope Stabilisation & Soil Nailing: Submission Workflows for Temporary Hillside Excavations

Slope Stabilisation & Soil Nailing: Submission Workflows for Temporary Hillside Excavations

Key Takeaways A defensible hillside excavation submission connects the ground model, temporary works design, authority requirements, and construction controls from the beginning. Define the temporary and permanent works interfaces before design responsibility becomes unclear. Investigate soil, rock, groundwater, drainage, adjacent assets, and existing utilities proportionately to risk. Verify soil nailing against local and global failure […]

Common Reasons BCA Rejects Temporary ERSS Submissions (And How to Avoid Them)

Common Reasons BCA Rejects Temporary ERSS Submissions (And How to Avoid Them)

Key Takeaways Temporary ERSS submissions are commonly returned when the technical evidence, drawings, design assumptions, and authority responses do not form one clear and verifiable package. Confirm that every required form, report, calculation, drawing, and supporting record is included. Base the ERSS design on current site investigation, groundwater, utility, and neighbouring-structure information. Show the design […]

The Annex C & Annex E Workflow: On-Site ERSS Compliance During Execution

The Annex C & Annex E Workflow: On-Site ERSS Compliance During Execution

Key Takeaways ERSS compliance during execution depends on disciplined supervision, clear authority, and records that connect site actions to approved design and monitoring requirements. Annex C controls the construction and inspection workflow for ERSS works. Annex E provides the monitoring, threshold, and response framework. The RE, RTO, and Site Manager need distinct but coordinated responsibilities. […]

The Cost of ERSS Submissions in Singapore: Breakdown of Consultant Fees, Checking Fees, and Testing

The Cost of ERSS Submissions in Singapore: Breakdown of Consultant Fees, Checking Fees, and Testing

Key Takeaways ERSS costs depend on the excavation, ground conditions, design responsibility, checking requirements, and the level of construction-stage support needed. A useful budget separates professional fees from testing, monitoring, authority coordination, and risk allowances. ERSS is a temporary earth-retaining system used to support excavations and control ground movement. Consultant fees rise with excavation depth, […]

Leveraging AI and Machine Learning in Geotechnical Back-Analysis for ERSS Submissions

Leveraging AI and Machine Learning in Geotechnical Back-Analysis for ERSS Submissions

Key Takeaways AI can make geotechnical back-analysis faster and more consistent, but it does not replace the Professional Engineer responsible for the design and submission. The strongest ERSS workflows connect trustworthy monitoring data, calibrated numerical models, transparent assumptions, and clear authority evidence. Back-analysis helps reveal how soil, groundwater, support systems, and adjacent structures behave in […]

Temporary King Post and Strutting Systems: Structural Detailing for BCA Approval

Temporary King Post and Strutting Systems: Structural Detailing for BCA Approval

Key Takeaways A temporary king post and strutting system is only as reliable as its design basis, connections, construction sequence, and site control. BCA approval depends on a coordinated package that explains both the engineering and how the system will be built. Define the ground, loading, geometry, and construction stages before detailing steel. Check member […]

Roof extension regulations in Singapore: Structural limits you must know

Roof extension regulations in Singapore: Structural limits you must know

Key Takeaways Adhering to Singapore’s strict building codes is essential for any roof extension project, requiring careful planning and professional oversight to remain compliant. BCA approval remains the primary requirement for all structural additions. Proper calculation of dead and live loads ensures long-term safety. Professional Engineers must endorse all structural analysis documentation and plans. Climate […]

When exactly do you need a structural PE for HDB renovations? A homeowner’s guide

When exactly do you need a structural PE for HDB renovations? A homeowner’s guide

Key Takeaways Understanding structural safety guidelines is essential for any homeowner planning a home upgrade. Here are the core principles you need to know: Structural modifications often require professional certification to ensure building stability. HDB permits are mandatory for specific hacking works to protect block integrity. Identifying the difference between load-bearing and non-structural walls prevents […]

What to do if you notice structural cracks in your Singapore landed home

What to do if you notice structural cracks in your Singapore landed home

Key Takeaways Identifying structural risks early can save homeowners from costly repairs and maintain safety. By understanding the causes of damage, you can take informed steps to secure your property. Differentiate between cosmetic and structural crack patterns. Conduct systematic documentation to track crack development. Engage a professional engineer to analyze underlying soil or settlement issues. […]

Periodic Structural Inspection Requirements for Existing Buildings

periodic structural inspection

Structural Inspection Requirements for Existing Buildings: When and Why You Need a Periodic Structural Inspection Introduction to Asset Safety Urban infrastructure constantly ages and degrades over time. Consequently, building safety is a paramount global concern. Structural inspection requirements for existing buildings are increasingly stringent. Governments worldwide recognize the severe dangers of urban decay. Therefore, a […]