5-Year vs 10-Year PSI Cycles: How Building Use Sets Your Inspection Deadline
Introduction Your building’s PSI cycle is either 5 years or 10 years, and the deciding factor is its approved use in BCA records. Non-residential buildings and shophouses undergo periodic structural inspection every 5 years. Residential buildings require PSI every 10 years. The classification follows the building’s approved purpose, not its current tenants or internal fit-out. […]
Flood Risk and Minimum Platform Levels: PUB Requirements for Industrial and Landed Sites in Singapore
Introduction PUB requires every new industrial facility and landed house in Singapore to set finished platform levels at or above 4.0 m SHD for southern coast developments and 4.5 m SHD for northern coast developments, or at least 300–600 mm above the adjacent road level-whichever is higher. These minimum platform level rules, tightened in 2011 […]
Planning 2027 CapEx Budgeting for PSI in Singapore Commercial Buildings
Introduction Planning 2027 CapEx budgeting for PSI in Singapore commercial buildings means forecasting and reserving capital for both the statutory Periodic Structural Inspections mandated by BCA and the downstream structural remediation works those inspections typically uncover. For asset owners closing FY2026 books and preparing FY2027 capital expenditures, getting this right now is the difference between […]
Retention vs Regularisation Submission: What Is the Difference for Industrial and Commercial Owners in Singapore?
Introduction A retention submission is a request for retrospective regulatory approval to keep specific unauthorised building works already in place – such as a steel mezzanine, a loading-bay canopy, or a shopfront extension – by demonstrating they meet current safety and planning standards. A regularisation submission is broader: it addresses all unauthorised works across an […]
The Singapore Authority Approval Map for Businesses: BCA and Beyond
Introduction The Singapore authority approval map for businesses is the structured pathway that determines which government agencies must sign off on a construction, fit-out, or change-of-use project-and in what sequence. At the centre of this map sits the Building and Construction Authority (BCA), but successful projects in Singapore require coordinated approvals from multiple agencies including […]
JTC Plan Consent vs BCA Approval: Which Comes First for Industrial Tenants in Singapore?
Introduction For industrial tenants on JTC land planning any renovation works, mezzanine installations, or structural changes, JTC plan consent vs BCA approval sequencing is one of the first questions that needs a clear answer. The general rule: JTC plan consent (landowner consent) should be secured before or concurrently with BCA structural approval. JTC acts as […]
Landed Property Redevelopment Guide for Owners

A landed property redevelopment guide for Singapore owners covering feasibility, design, authority approvals, construction risk, and project handover.
Site Supervision Requirements in Singapore for Structural Works

BCA site supervision requirements in Singapore: who must supervise, how many RE and RTO supervisors by project value, plan, records and consequences.