PFM SCDF License Application Process
Petroleum and Flammable Materials License Application Workflow
Petroleum and Flammable Materials Documentation Requirements
Architectural drawings must clearly show site layout and facility arrangement, including storage tank locations and spacing, secondary containment arrangements, fire protection equipment locations, access roads and emergency routes, and drainage systems and interceptors; the required documents must support the p fm storage licence application and comply with SCDF submission requirements. Accurate documentation should include certified true copies of building plans, detailed information on the premises, and the quantity of petroleum and flammable materials stored. Drawings must be prepared according to SCDF submission standards with appropriate scales, dimensions, and annotations.
Structural drawings and calculations demonstrate the structural integrity of storage systems and supporting infrastructure. Requirements include foundation designs and bearing capacity calculations, tank structural calculations according to applicable codes, seismic analysis and design provisions, and structural fire protection details. All calculations must be endorsed by the appointed QP for Structural Works. The documents should also cover storage facilities, materials stored, and relevant safety measures to ensure compliance and avoid delays in the application process.
Technical Review Process
The Singapore Civil Defence Force plays a crucial role in reviewing an FM SCDF submission for licence approval in Singapore. The review process typically takes 4-6 weeks for standard applications, though timelines can vary depending on the property, the petroleum and flammable materials involved, and the complexity of the flammable materials storage proposal. Understanding fm scdf submission requirements helps a business obtain the storage licence, comply with regulations, and avoid non compliance or severe penalties.
The review encompasses multiple technical disciplines to ensure comprehensive safety assessment. Structural review evaluates tank and foundation designs, structural fire protection measures, and seismic provisions. Fire safety review examines fire safety regulations under the fire safety act, fire alarms, fire safety systems, maintenance needs, maintained equipment, regular inspections, proper warning signs, and caution labels. Process safety review addresses handling procedures for flammable liquids, checks individual flammable materials, identifies potential hazards, assesses emergency response plans, and considers transport, import, environment, public safety, and measures to prevent accidents.
Other government agencies may also be involved depending on the licensed premises, private use or business use, and whether the applicant intends to store petroleum on the premises.